File No. D2007

Complete dredging package.  Includes tug, sectional spud barge, excavator and trucks.

 

   Tug

  -   41.5’ x13’11” x 4’4” steel

-        Built in 1980 by Hamilton-Boiler Pump & Machine Works

-        Canadian Registry

  -   14.9 tons

  -   Modified V, planning hull

-        Powered by 6-7l Detroit Diesel (175 hp supercharged)

-        C/w Twin Disc MG5061A transmission (1.97:1 ratio)

-   Wagner Hydraulic steering

-        26” x 26”  propeller

 

  -  120 volt AC power

-   12 volt DC power

-        VHF Radio

-        Gem Tronics Depth Sounder

-        Danforth Compass

-        420 gallon fuel capacity

-        93.5 gallons holding tank

 

  Sectional Spud Barge

-        65’ x 30’10” x 5’

-        Total displacement -  45.54 Tons

-        Built in 1980  Port Athur Ont.

-        Lengthened and modified in 1992

-        Port barge 15’4” ( Displacement - 19.6 Tons)

-        Starboard barge 14’8” (Displacement – 25.9 Tons)

-        With a 10.5” coupling system

-        Hull material – ½” steel plating.  The bottom 30” is double plated

-        Deck material – 3/16” checkered steel plate

-        Structural details available

-        Crane Pad 16” H x 48”W x 30’ long

-                  Pad Material – Hardwood planks 16”H x 24” W x 30’ long

-                   Pad Mounting – 6” x 4” Structural steel angle bar

-        Crane location must be at 17.5’ from the rear for the barges longitudinally at the centre of the barges athwartship

 

-        Caterpillar Winch Model 4F2516 located starboard front corner

             Powered by 165 hp gas General Motors engine

  -   Stabilizer leg located 13’ aft of the forward bow area on each barge  

               Sleeve Diameter 24” x 5/8” tube

             Leg Diameter – 18” x 1” tube

               Leg Length – 30 ‘ of suable length

               Raise Mechanism – 12” x 12” Wide flange structural column             

               Safety Lock System – 2.5” solid round steel pin with a lock pin